Array
(
    [0] => Array
        (
            [menuid] => 85
            [title] => JCU Science Place Building
            [pageid] => 85
            [seotitle] => jcu-science-place-building-298sy3
            [keywords] => 
            [description] => 
            [featuretext] => 
            [tags] => 
            [dmozdesc] => 0
            [scripts] => 
            [styles] => 
            [start] => 2017-09-02 11:06:00
            [end] => 0000-00-00 00:00:00
            [updated] => 2017-02-09 11:09:18
            [listlimit] => 10
            [structure] => {"85":{"128":{"contid":"128","index":0,"col":"col1","parent":0,"parentIndex":0}}}
            [menuPageType] => Page
            [menuTitle] => JCU Science Place Building
            [root_id] => 19
            [approved_published] => 1
            [status_approved_page] => 1
            [date_start] => 2017-02-09 11:06:00
            [event_start] => 1970-01-01 10:00:00
            [event_end] => 1970-01-01 10:00:00
            [typevalue] => 
            [layoutfilename] => freestyle.json
            [date_end] => 0000-00-00 00:00:00
            [finalseolink] => jcu-science-place-building-298sy3/
            [comments] => 0
            [template] => Listing Detail
            [edit_date] => 2017-07-07 10:21:56
            [seotitlebar] => JCU Science Place Building
            [listingTable] => listing_projects_264f5mzq
            [rootTitle] => Projects
            [parentTemplate] => Default
            [blogTitle] => Projects
            [blogLimit] => 1000
            [blog_blogdetailstpl] => listing_details_default.php
            [blog_bloglistingtpl] => listing_listing_default.php
            [blog_featured] => 0
            [blogUrl] => projects/
            [pageCount] => 41
            [isEventPost] => No
            [ContValuex] => 
            [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/85/blogskale_09-813_jcu_science_place_building_2.jpg
            [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/85/blogskale__big_09-813_jcu_science_place_building_2.jpg
            [shareimage] => 
            [prepend_title] => 
            [append_title] =>  | DM Group
            [username] => oracle
            [firstname] => Ora
            [lastname] => Cle
            [member_since] => 2015-06-04 15:20:13
            [show_author] => 
            [show_avatar] => 
            [show_date] => 
            [lat] => 
            [lng] => 
            [address] => 
            [fulldata] => 
            [maptype] => 
            [id] => 96
            [project_client] => JCU
            [project_year] => 
            [project_type] => 
            [project_gallery] => 0
            [project_description] => 

Lend Lease are currently building the JCU Science Place Building in Townsville.

The five level, 12,000 m2 facility will be built within the University’s Science and Engineering Precinct, and will accommodate projected growth in student and staff numbers in Chemistry, Biology and Biochemistry over the next decade.

It’s the biggest project ever undertaken on the Townsville campus.

DM Group was engaged to provide full structural steel documentation of the building totalling approx. 255t of structural steel and cold rolled steel.

Interesting facts;

  • Project required 4,825 detail drawings to allow the steel fabrication of the project.
  • DM Group office broke this project down internally into 12 separate packages to allow teams of draftsman to work simultaneously on delivering the documentation.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial,mining and marine sectors.

[project_types] => {"0":""} ) [1] => Array ( [menuid] => 46 [title] => Apex Park [pageid] => 46 [seotitle] => apex-park [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 11:21:00 [listlimit] => 10 [structure] => {"46":{"68":{"contid":"68","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Apex Park [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:48:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => apex-park/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Apex Park [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/46/blogskale__mg_0515.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/46/blogskale__big__mg_0515.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 44 [project_client] => RCP [project_year] => [project_type] => [project_gallery] => 15 [project_description] =>

New architecturally designed park walkways and equipment.

Apex Park is targeted to be a focal point for community useable space and is an initiative in ecological sensitivity and river management while simultaneously providing the local community with access to waterfront activities in an environmentally unique space.

  • 3D modelling and steel detailing of walkways, landings, decks, stairs and feature panels.
  • Installation 100% with no re-work required.

Collaborate with architects and engineers for final outcome of design.

 

Come and have a talk to us about how we can assist with your project.

 

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [2] => Array ( [menuid] => 82 [title] => NRL Cowboys House [pageid] => 82 [seotitle] => nrl-cowboys-house-xn9uqv [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 10:54:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 10:59:19 [listlimit] => 10 [structure] => {"82":{"125":{"contid":"125","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => NRL Cowboys House [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 10:54:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => nrl-cowboys-house/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => NRL Cowboys House [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/82/blogskale_09-888_nrl_cowboys_house_2.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/82/blogskale__big_09-888_nrl_cowboys_house_2.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 88 [project_client] => NRL Cowboys House [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Paynter Dixon taking charge in developing the NRL Cowboys House.

This great facility is being supported by a $9.5 million investment from the Australian Government and will provide accommodation in
Townsville for young Aboriginal and Torres Strait Islanders from the beginning of the 2017 school year.

Interesting facts;

3D Laser scanning was completed on the block work to accurately pick up raking bond beams and multi-pitched roof lines on the building to ensure structural steel tie in is 100% correct.

Come and have a talk to us about how we can assist with your project.  

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [3] => Array ( [menuid] => 93 [title] => Bank of Papua New Guinea [pageid] => 93 [seotitle] => bank-of-papua-new-guinea [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 13:28:27 [listlimit] => 10 [structure] => {"93":{"136":{"contid":"136","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Bank of Papua New Guinea [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 13:24:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => bank-of-papua-new-guinea/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Bank of Papua New Guinea [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/93/blogskale_bpng-web.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/93/blogskale__big_bpng-web.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 145 [project_client] => Beacon Consulting [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

The Bank of Papua New Guinea (BPNG) is currently in construction for their new Currency Distribution Facility (CDF) in Lae Morobe Province.

Beacon Consulting are the project managers, DM Group was engaged to complete all steel detailing, concrete and reinforcement BIM modelling.

 

Interesting facts;

 Project was broken up into 5 stages:

4 Stages of BIM Modelling, Structural Steel

1 Stage of BIM Modelling, Concrete reinforcement including Slabs, Walls, Columns, Beams & Stairs

Project was developed in coordination with structural engineers and architectural team.

 

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [4] => Array ( [menuid] => 47 [title] => Central Cinemas BCC [pageid] => 47 [seotitle] => central-cinemas-bcc [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-15 10:06:42 [listlimit] => 10 [structure] => {"47":{"69":{"contid":"69","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Central Cinemas BCC [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:57:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => central-cinemas-bcc/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Central Cinemas BCC [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/47/blogskale_img_8621edit.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/47/blogskale__big_img_8621edit.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 47 [project_client] => Birch Carrol & Coyle [project_year] => [project_type] => [project_gallery] => 16 [project_description] =>
  • 3D modelling and steel detailing of all Upper roof framing and Lower awning framing.
  • 3D modelling of precast concrete panels, engineering certification included for lifting & propping.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-frame-construction","1":"steel-detailing"} ) [5] => Array ( [menuid] => 80 [title] => United Service Station & Red Rooster [pageid] => 80 [seotitle] => united-service-station-red-rooster [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 10:29:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 10:38:07 [listlimit] => 10 [structure] => {"80":{"123":{"contid":"123","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => United Service Station & Red Rooster [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 10:29:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => united-service-station-red-rooster/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => United Service Station & Red Rooster [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/80/blogskale_united-fuel-shop.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/80/blogskale__big_united-fuel-shop.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 83 [project_client] => United Service Station & Red Rooster [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

The United Petroleum service station and Red Rooster fast food outlet project, to be developed at 450 Bayswater Rd, will be part of an $8 million retail convenience centre in Mount Louisa.

Interesting facts;

Shop drawings and steel framing supply on this project.

The project was split into 3 categories for steel detailing and shop drawings, it required fast turnaround time for tight project deadlines.

Roof framing and awning framing integrates with precast panel – complete 3d modelling to ensure an accurate erection sequence.

 Come and have a talk to us about how we can assist with your project.  

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [6] => Array ( [menuid] => 90 [title] => Sunshine Coast Hospital - Hub & Auditorium [pageid] => 90 [seotitle] => sunshine-coast-hospital-hub-auditorium-57rvp2 [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 11:25:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 11:30:47 [listlimit] => 10 [structure] => {"90":{"133":{"contid":"133","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Sunshine Coast Hospital - Hub & Auditorium [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 11:25:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => sunshine-coast-hospital-hub-auditorium-57rvp2/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Sunshine Coast Hospital - Hub & Auditorium [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/90/blogskale_09-813_sunshine_coast_hospital.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/90/blogskale__big_09-813_sunshine_coast_hospital.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 105 [project_client] => Sunshine Coast University Hospital [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Lend Lease are currently building the Sunshine Coast University Hospital, it will be a tertiary teaching hospital, servicing the Sunshine Coast region, as the hub in an integrated network of accessible healthcare.

DM Group office was engaged to provide full structural steel documentation of the HUB and Auditorium totally over 405t of structural steel and cold rolled steel.

Interesting facts;

  • Project required 5,000 detail drawings to allow the steel fabrication of the project.
  • DM Group office broke the project down internally into 15 separate packages to allow teams of draftsman to work simultaneously on delivering the documentation.

Talk to us about steel detailing and how we can assist with your next project.

[project_types] => {"0":""} ) [7] => Array ( [menuid] => 95 [title] => Veer Apartments [pageid] => 95 [seotitle] => veer-apartments [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 13:45:15 [listlimit] => 10 [structure] => {"95":{"138":{"contid":"138","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Veer Apartments [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 13:40:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => veer-apartments/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Veer Apartments [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/95/blogskale_8b4f693febccbe4bd3f9fa0f726901a4.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/95/blogskale__big_8b4f693febccbe4bd3f9fa0f726901a4.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 153 [project_client] => RCQ Constructions [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Veer is an $11-million luxury apartment including restaurants on ground floor, it sits in prime position along The Strand in Townsville and is designed to attracted more high-level properties to the suburb of North Ward. 

The development is set to bring a modern aspect to the strip and deliver two new hospitality venues in the ground-level commercial tenancies.

 

Interesting facts;

3D laser scanning was included to ensure block work and structural steel integration.

4 stage process consisting of:

-Roof Steel

-Balcony Steel

-Front Lower Awning

-Pool Area Awning

 

Come and have a talk to us about how we can assist with your project.

 

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-frame-construction","1":"steel-detailing","2":"3d-laser-scanning"} ) [8] => Array ( [menuid] => 51 [title] => Metropole Hotel [pageid] => 51 [seotitle] => metropole-hotel [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 12:21:41 [listlimit] => 10 [structure] => {"51":{"73":{"contid":"73","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Metropole Hotel [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:18:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => metropole-hotel/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Metropole Hotel [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/51/blogskale_img_9146.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/51/blogskale__big_img_9146.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 68 [project_client] => Metropole Hotel [project_year] => [project_type] => [project_gallery] => 19 [project_description] =>
  • 3D modelling and steel detailing of all Upper roof framing and Lower awning framing.
  • 3D modelling of precast concrete panels, engineering certification included for lifting & propping.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing"} ) [9] => Array ( [menuid] => 55 [title] => YWCA [pageid] => 55 [seotitle] => ywca [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 13:27:52 [listlimit] => 10 [structure] => {"55":{"77":{"contid":"77","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => YWCA [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:28:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => ywca/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => YWCA [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/55/blogskale__mg_3823.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/55/blogskale__big__mg_3823.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 76 [project_client] => [project_year] => [project_type] => [project_gallery] => 24 [project_description] =>
  • 3D modelling and steel detailing of all Upper roof framing and Lower awning framing.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-frame-construction","1":"steel-detailing"} ) [10] => Array ( [menuid] => 48 [title] => Holborn Apartments [pageid] => 48 [seotitle] => holborn-apartments [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 12:16:24 [listlimit] => 10 [structure] => {"48":{"70":{"contid":"70","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Holborn Apartments [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:58:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => holborn-apartments/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Holborn Apartments [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/48/blogskale_img_9052.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/48/blogskale__big_img_9052.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 49 [project_client] => RCQ Constructions [project_year] => [project_type] => [project_gallery] => 17 [project_description] =>
  • 3D modelling and steel detailing of all Upper roof framing and Lower awning framing.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-frame-construction","1":"steel-detailing"} ) [11] => Array ( [menuid] => 49 [title] => Kirwan High School [pageid] => 49 [seotitle] => kirwan-high-school [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 13:22:10 [listlimit] => 10 [structure] => {"49":{"71":{"contid":"71","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Kirwan High School [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:12:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => kirwan-high-school/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Kirwan High School [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/49/blogskale_img_7962edit.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/49/blogskale__big_img_7962edit.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 62 [project_client] => Kirwan High School [project_year] => [project_type] => [project_gallery] => 18 [project_description] =>
  • 3D modelling and detailing of all structure façade panels.
  • Integration of main steelwork framing.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-frame-construction","1":"steel-detailing"} ) [12] => Array ( [menuid] => 81 [title] => Southern Cross Catholic College [pageid] => 81 [seotitle] => southern-cross-catholic-college [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 10:47:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 10:49:08 [listlimit] => 10 [structure] => {"81":{"124":{"contid":"124","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Southern Cross Catholic College [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 10:47:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => southern-cross-catholic-college/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Southern Cross Catholic College [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/81/blogskale_09-863_southern_cross_school_2.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/81/blogskale__big_09-863_southern_cross_school_2.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 86 [project_client] => The Southern Cross Catholic College [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Structural steel detailing completed with 1000+ fabrication drawings to allow all hot rolled and cold rolled fabrication for this building.

Come and have a talk to us about how we can assist with your project.  

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [13] => Array ( [menuid] => 54 [title] => Watermark Apartments and Restaurant [pageid] => 54 [seotitle] => watermark-apartments-and-restaurant [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 11:27:56 [listlimit] => 10 [structure] => {"54":{"76":{"contid":"76","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Watermark Apartments and Restaurant [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:24:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => watermark-apartments-and-restaurant/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Watermark Apartments and Restaurant [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/54/blogskale_img_8543edit.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/54/blogskale__big_img_8543edit.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 74 [project_client] => [project_year] => [project_type] => [project_gallery] => 23 [project_description] =>

Watermark restaurant upgrade

  • 3D Laser scanning 
  • 3D modelling and steel detailing of all roof framing and feature framing.
  • Installation 100% with no re-work required.

Collaborate with architects and engineers for final outcome of design.

 

Come and have a talk to us about how we can assist with your project.

 

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [14] => Array ( [menuid] => 97 [title] => Carseldine Central Brisbane [pageid] => 97 [seotitle] => carseldine-central-brisbane [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 14:07:12 [listlimit] => 10 [structure] => {"97":{"140":{"contid":"140","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Carseldine Central Brisbane [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 14:02:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => carseldine-central-brisbane/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Carseldine Central Brisbane [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/97/blogskale_steel_detail_dm_group_hero.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/97/blogskale__big_steel_detail_dm_group_hero.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 168 [project_client] => Lancini Property and Development [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Carseldine Central provides a local neighbourhood shopping centre to cater to the growing population of Brisbane.  The centre is easily accessible by car and public transport and provides undercover car parking.

 

Its central location services the everyday needs of the local residents with the centre’s drawcard being a Woolworths Supermarket that is supported by other convenience retail, food and beverage, medical/allied services and professional/retail services.

 

Interesting facts;

The architecturally designed complex roof system allowed for many intricate areas of steel detailing and fabrication.

2 Stages completed for site works breakdown.

Collaborated with architects and engineers for final outcome of design.

 

Come and have a talk to us about how we can assist with your project.

 

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [15] => Array ( [menuid] => 52 [title] => Paddington Apartments [pageid] => 52 [seotitle] => paddington-apartments [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 12:57:42 [listlimit] => 10 [structure] => {"52":{"74":{"contid":"74","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Paddington Apartments [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:20:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => paddington-apartments/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Paddington Apartments [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/52/blogskale_img_8447edit.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/52/blogskale__big_img_8447edit.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 69 [project_client] => [project_year] => [project_type] => [project_gallery] => 21 [project_description] =>
  • 3D modelling and steel detailing of all Upper roof framing and Lower awning framing.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-frame-construction","1":"steel-detailing"} ) [16] => Array ( [menuid] => 96 [title] => Walker St Council Roof Replacement [pageid] => 96 [seotitle] => jackson-semler [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 14:02:01 [listlimit] => 10 [structure] => {"96":{"139":{"contid":"139","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Walker St Council Roof Replacement [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 13:53:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => jackson-semler/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Jackson Semler [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/96/blogskale_walker_street.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/96/blogskale__big_walker_street.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 165 [project_client] => Jackson + Semler [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

A $3 million contract for structural upgrade to roof and refurbishment of the top floor of the 40-year-old civic administration centre in the Townsville CBD was awarded by the Townsville City Council.  The contract marked the first major upgrade of the centre’s roof since it was opened in 1976.

 

The building is currently being used for local government administration, meetings, functions and civic ceremonies and has been used for four decades.

 

The scope of the project included a considerable amount of structural work on the building’s roof system, including the replacement of the roof, and refurbishment of the second floor.

 

Interesting facts;

8 stage project delivery process

Building upgrade occurred during council workers working hours

3D laser scanning was done on every stage to ensure upgrade of new roof framing integrated with the existing structure.

 Come and have a talk to us about how we can assist with your project.

 We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing","1":"3d-laser-scanning"} ) [17] => Array ( [menuid] => 99 [title] => Harris Scarfe, Willows – Townsville [pageid] => 99 [seotitle] => harris-scarfe-willows-townsville [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 15:48:43 [listlimit] => 10 [structure] => {"99":{"142":{"contid":"142","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Harris Scarfe, Willows – Townsville [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 15:48:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => harris-scarfe-willows-townsville/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Harris Scarfe, Willows – Townsville [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/99/blogskale_harris_scarfe.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/99/blogskale__big_harris_scarfe.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 187 [project_client] => ADCO [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Harris Scarfe is coming to Willows Shopping Centre as part of the Willows 90 million dollar expansions.

 The Harris Scarfe store will comprise 2599sqm and open in April 2017.

 

Interesting facts;

Laser scanning was utilised to ensure accuracy of existing building parameters including rafter apex heights, existing gutters lines and critical floor levels.

 

Completed on this project was precast panel detailing and structural steel detailing to ensure integration for riggers.

 

Excavation of existing footing had to take place to ensure underside of steel and Panel RLS were correct.

 

Come and have a talk to us about how we can assist with your project.

 

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing","1":"3d-laser-scanning"} ) [18] => Array ( [menuid] => 53 [title] => Townsville Marine Precinct Development [pageid] => 53 [seotitle] => townsville-marine-precinct-development [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 11:52:06 [listlimit] => 10 [structure] => {"53":{"75":{"contid":"75","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Townsville Marine Precinct Development [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:23:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => townsville-marine-precinct-development/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Townsville Marine Precinct Development [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/53/blogskale_dmgroup_steel_detailing.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/53/blogskale__big_dmgroup_steel_detailing.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 72 [project_client] => Townsville Marine [project_year] => [project_type] => [project_gallery] => 22 [project_description] =>
  • 3D modelling and detailing of all temporary and permanent works.
  • Temp works includes all access platforms, walkways, lifting jigs, pile clamps, headstock access platforms and catwalks. All Jig frames for multi pile driving.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing"} ) [19] => Array ( [menuid] => 98 [title] => APLNG [pageid] => [seotitle] => aplng [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 15:18:56 [listlimit] => 10 [structure] => {"98":{"141":{"contid":"141","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => APLNG [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 14:27:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => aplng/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => APLNG [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/98/blogskale_aplng_1.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/98/blogskale__big_aplng_1.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => [project_client] => [project_year] => [project_type] => [project_gallery] => [project_description] => [project_types] => ) [20] => Array ( [menuid] => 50 [title] => Lucinda - Tropical Cyclone Yasi Re-development Project [pageid] => 50 [seotitle] => lucinda-tropical-cyclone-yasi-re-development-project [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 13:15:11 [listlimit] => 10 [structure] => {"50":{"72":{"contid":"72","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Lucinda - Tropical Cyclone Yasi Re-development Project [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 14:14:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => lucinda-tropical-cyclone-yasi-re-development-project/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Lucinda - Tropical Cyclone Yasi Re-development Project [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/50/blogskale_lucinda_3.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/50/blogskale__big_lucinda_3.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 65 [project_client] => [project_year] => [project_type] => [project_gallery] => 20 [project_description] =>
  • 3D modelling and detailing of all temporary and permanent works.
  • Temp works includes all access platforms, walkways, lifting jigs, pile clamps.
  • Permanent works includes
    • 53m long single welded frame Fender Truss.
    • Cross Under Walkways
    • Dolphin Berth Access BD6 & BD8 & BD7
    • Northern Walkway
    • Ship loader Secondary Strong Point
    • Northern Strongpoint
    • Wharf Roadway Access Frame
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing"} ) [21] => Array ( [menuid] => 37 [title] => Douglas Reservoir Existing to New Drain Line Tie In [pageid] => 37 [seotitle] => douglas-reservoir-existing-to-new-drain-line-tie-in [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 13:30:22 [listlimit] => 10 [structure] => {"37":{"59":{"contid":"59","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Douglas Reservoir Existing to New Drain Line Tie In [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:15:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => douglas-reservoir-existing-to-new-drain-line-tie-in/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Douglas Reservoir Existing to New Drain Line Tie In [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/37/blogskale_09-470-reservior_pipe_tie-in-002_060813.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/37/blogskale__big_09-470-reservior_pipe_tie-in-002_060813.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 27 [project_client] => Douglas Reservoir [project_year] => [project_type] => [project_gallery] => 8 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • Model custom pipe for tie in application.
  • Full fabrication package delivered.
  • Qualification scan in workshop to confirm fabrication accuracy.
  • Installation 100% with no re-work required.
[project_types] => {"0":"3d-laser-scanning"} ) [22] => Array ( [menuid] => 38 [title] => Ernest Henry Mine Cyclone Upgrade [pageid] => 38 [seotitle] => ernest-henry-mine-cyclone-upgrade [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 14:22:54 [listlimit] => 10 [structure] => {"38":{"60":{"contid":"60","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Ernest Henry Mine Cyclone Upgrade [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:19:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => ernest-henry-mine-cyclone-upgrade/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Ernest Henry Mine Cyclone Upgrade [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/38/blogskale_dscn0934.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/38/blogskale__big_dscn0934.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 29 [project_client] => Ernest Henry Mine [project_year] => [project_type] => [project_gallery] => 9 [project_description] =>

Ernest Henry Mine Cyclone Upgrade

  • Brownfield scanning of existing cyclone pack, overflow hopper, underflow hopper, support structure and all service pipes.
  • 3D model all existing features for an 100% accurate as built data set.
  • Re-design hoppers, supports and access platforms to suit new Kreb cyclone models.
  • Full fabrication package delivered for structural, plate and piping.
  • Installation 100% with no re-work required.

All 3D modelled and documented for the fabrication shop, clash detection, integration and design analysis are completed on all projects.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and steel framing in commercial, mining and marine sectors.

[project_types] => {"0":"3d-laser-scanning"} ) [23] => Array ( [menuid] => 36 [title] => A1 Scan with IP & LP lines [pageid] => 36 [seotitle] => a1-scan-with-ip-lp-lines [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 12:09:50 [listlimit] => 10 [structure] => {"36":{"58":{"contid":"58","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => A1 Scan with IP & LP lines [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:11:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => a1-scan-with-ip-lp-lines/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => A1 Scan with IP & LP lines [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/36/blogskale_a2_mill_image02.jpeg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/36/blogskale__big_a2_mill_image02.jpeg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 24 [project_client] => [project_year] => [project_type] => [project_gallery] => 7 [project_description] =>
  • Brownfield Scanning of existing area for ‘as built’ tie in.
  • Full design of double block and bleed pipework & supports.
  • Full fabrication package delivered.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing","1":"3d-laser-scanning"} ) [24] => Array ( [menuid] => 39 [title] => IPL Phosphate Hill Ammonia Separation Modifications [pageid] => 39 [seotitle] => ipl-phosphate-hill-ammonia-separation-modifications [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 12:00:01 [listlimit] => 10 [structure] => {"39":{"61":{"contid":"61","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => IPL Phosphate Hill Ammonia Separation Modifications [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:22:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => ipl-phosphate-hill-ammonia-separation-modifications/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => IPL Phosphate Hill Ammonia Separation Modifications [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/39/blogskale_tie_in_03.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/39/blogskale__big_tie_in_03.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 31 [project_client] => Incitec Pibot Limited [project_year] => [project_type] => [project_gallery] => 10 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • New piping tie-in review for separation modification project.
  • Qualification in workshop for fabrication accuracy to detail drawings.
  • Installation 100% with no re-work required.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and steel framing in commercial, mining and marine sectors.

[project_types] => {"0":"3d-laser-scanning"} ) [25] => Array ( [menuid] => 40 [title] => Maceration Tank [pageid] => 40 [seotitle] => maceration-tank [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 13:12:52 [listlimit] => 10 [structure] => {"40":{"62":{"contid":"62","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Maceration Tank [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:26:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => maceration-tank/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Maceration Tank [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/40/blogskale_scan_data_snapshot_02.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/40/blogskale__big_scan_data_snapshot_02.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 35 [project_client] => [project_year] => [project_type] => [project_gallery] => 11 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in to new tank, suction and delivery pipework.
  • Full design of tank, pipe works, supports and civils.
  • Full fabrication package delivered.
  • Installation 100% with no re-work required.
[project_types] => {"0":"3d-laser-scanning"} ) [26] => Array ( [menuid] => 41 [title] => New Seed Pumps & Piping System [pageid] => 41 [seotitle] => new-seed-pumps-piping-system [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 12:54:53 [listlimit] => 10 [structure] => {"41":{"63":{"contid":"63","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Seed Pumps & Piping System [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:27:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => new-seed-pumps-piping-system/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => New Seed Pumps & Piping System [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/41/blogskale_piping_detail_dm_group.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/41/blogskale__big_piping_detail_dm_group.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 37 [project_client] => Sugar [project_year] => [project_type] => [project_gallery] => 12 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • Design new seed pump pipe system for Pan 4 & Pan 8 to ensure plant reliability.
  • All existing piping removed and replaced with newly designed pipe system.
  • Full fabrication package delivered.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing","1":"3d-laser-scanning"} ) [27] => Array ( [menuid] => 44 [title] => No.3 Boiler Gas Duct Economiser Outlet Southern Side Monorail System [pageid] => 44 [seotitle] => no-3-boiler-gas-duct-economiser-outlet-southern-side-monorail-system [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-15 10:20:41 [listlimit] => 10 [structure] => {"44":{"66":{"contid":"66","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => No.3 Boiler Gas Duct Economiser Outlet Southern Side Monorail System [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:41:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => no-3-boiler-gas-duct-economiser-outlet-southern-side-monorail-system/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => No.3 Boiler Gas Duct Economiser Outlet Southern Side Monorail System [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/44/blogskale_09.426_003.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/44/blogskale__big_09.426_003.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 40 [project_client] => [project_year] => [project_type] => [project_gallery] => 13 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • New monorail constructed to assist installation of boiler No.3 Gas ducting.
  • Full design of monorail, supports.
  • Full fabrication package delivered.
  • Installation 100% with no re-work required.
[project_types] => {"0":"3d-laser-scanning"} ) [28] => Array ( [menuid] => 45 [title] => Prepared Cane Elevator [pageid] => 45 [seotitle] => prepared-cane-elevator [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-10 13:17:46 [listlimit] => 10 [structure] => {"45":{"67":{"contid":"67","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Prepared Cane Elevator [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2016-05-30 13:43:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => prepared-cane-elevator/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Prepared Cane Elevator [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/45/blogskale_steel_detailing_dm_group.jpeg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/45/blogskale__big_steel_detailing_dm_group.jpeg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 42 [project_client] => [project_year] => [project_type] => [project_gallery] => 14 [project_description] =>
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • New PPCE constructed for replacement of existing.
  • Design team worked closely with site staff to develop concept design.
  • Full fabrication package delivered.
  • Installation 100% with no re-work required.
[project_types] => {"0":"steel-detailing","1":"3d-laser-scanning"} ) [29] => Array ( [menuid] => 83 [title] => Sun Metals Vehicle Operations Building [pageid] => 83 [seotitle] => sun-metals-vehicle-operations-building [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 11:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 11:01:52 [listlimit] => 10 [structure] => {"83":{"126":{"contid":"126","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Sun Metals Vehicle Operations Building [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 11:00:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => sun-metals-vehicle-operations-building/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Sun Metals Vehicle Operations Building [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/83/blogskale_workshop_steel_detail_dm_group.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/83/blogskale__big_workshop_steel_detail_dm_group.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 92 [project_client] => Sun Metals Vehicle Operation Building [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Sun Metals Vehicle Operation Building - works completed by Jackson + Semler.

Interesting facts;

 Steel Detailing completed in a 1 week turnaround with 3 team members assisting in modeling, detailing and checking.

Come and have a talk to us about how we can assist with your project.  

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [30] => Array ( [menuid] => 84 [title] => Bundaberg Mill Conveyor Rectification Project [pageid] => 84 [seotitle] => bundaberg-mill-conveyor-rectification-project-6x3ehj [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 11:02:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 11:05:37 [listlimit] => 10 [structure] => {"84":{"127":{"contid":"127","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Bundaberg Mill Conveyor Rectification Project [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 11:02:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => bundaberg-mill-conveyor-rectification-project-6x3ehj/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Bundaberg Mill Conveyor Rectification Project [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/84/blogskale_09-568_bundy_final_8.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/84/blogskale__big_09-568_bundy_final_8.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 94 [project_client] => Bingera Sugar Mill [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Bingera sugar mill suffered millions of dollars of damage after a fire tore through the building.

DM Group were engaged to 3d laser scan the existing 80m long conveyor and supporting members for full replacement & rectification.

Interesting facts;

3 man site crew flew down over Saturday and Sunday to 3d laser scan the existing (burnt) conveyor, supporting structure, existing building frame, head chute, GTU (Gravity take-up unit), tail chute, and surrounding concrete profiles.

DM Group office completed the following in 1 (one) week with an 8 man modeling/ design and detailing team all working in coordination with each other;

  • As built modelling of existing structure/ conveyor etc.
  • New proposed design, arrangement and conveyor profiling for client approval.
  • Engineering drawings and documentation for upgrade of existing support structure.
  • Design & engineering on conveyor gallery, GTU, head and tail chutes, gearbox, bearings, shafts and guarding.
  • Full fabrication package for all works.
  • Installation 100% with no re-work required.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [31] => Array ( [menuid] => 88 [title] => Berth 11 Safety Walkway [pageid] => 88 [seotitle] => berth-11-safety-walkway [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 11:13:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 11:15:09 [listlimit] => 10 [structure] => {"88":{"131":{"contid":"131","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Berth 11 Safety Walkway [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 11:13:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => berth-11-safety-walkway/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Berth 11 Safety Walkway [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/88/blogskale_09-854_berth_11_walkway_potl_perm_works_2.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/88/blogskale__big_09-854_berth_11_walkway_potl_perm_works_2.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 101 [project_client] => Port of Townsville Limited [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

DM Group were engaged to complete full 3D laser scanning on existing access walkways (approx 180m long), headstock, ship loader rail, support piles and complete an existing as built 3d model.

DM Group are completing the design and steel detailing of a temporary access jig that will allow access to underside of headstocks.  This will allow the installation crew to scan the concrete beams, this x-ray of concrete will determine the location of existing steel reinforcement to ensure chemical anchors don't impact the structural integrity of the beams.  

Structural hangers will then be installed to support the replacement access walkways.

All access walkways, handrails and flooring system will be 3d modelled and documented for the fabrication shop.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and steel framing in commercial, mining and marine sectors.

[project_types] => {"0":""} ) [32] => Array ( [menuid] => 89 [title] => Collinsville QAS Replacement Station [pageid] => 89 [seotitle] => collinsville-qas-replacement-station [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-02 11:16:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-09 11:55:37 [listlimit] => 10 [structure] => {"89":{"132":{"contid":"132","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Collinsville QAS Replacement Station [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-09 11:16:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => collinsville-qas-replacement-station/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Collinsville QAS Replacement Station [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/89/blogskale_manufacture_5.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/89/blogskale__big_manufacture_5.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => oracle [firstname] => Ora [lastname] => Cle [member_since] => 2015-06-04 15:20:13 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 103 [project_client] => [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Collinsville QAS Replacement Station and Relief Quarters has now been installed, photos show part build install.  

For this project DM Group completed all framing design, engineering, detail drafting, manufacturing and delivery to site.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-frame-construction"} ) [33] => Array ( [menuid] => 91 [title] => Willows Mall 9 Entrance - Townsville [pageid] => 91 [seotitle] => willows-mall-9-entrance-townsville [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-07-07 10:10:52 [listlimit] => 10 [structure] => {"91":{"134":{"contid":"134","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Willows Mall 9 Entrance - Townsville [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-15 10:08:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => willows-mall-9-entrance-townsville/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Willows Mall 9 Entrance - Townsville [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/91/blogskale_20160831_094328.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/91/blogskale__big_20160831_094328.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => kat [firstname] => Katrina [lastname] => Campbell [member_since] => 2017-02-15 09:57:52 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 132 [project_client] => [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

The Willows Shopping Town in Townsville is a new $55 million brown field redevelopment and extension project that includes a new full line Woolworths super market, 3 mini-majors & approximately 30 specialty shops.

Interesting Facts:

Architecturally designed fully welded frames with laser cut perforated facade shop drawing for fabrication completed for single transport frame.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [34] => Array ( [menuid] => 94 [title] => Sun Metals Zinc Ferrite Storage Drying Shed [pageid] => 94 [seotitle] => sun-metals-zinc-ferrite-storage-drying-shed [keywords] => steel detailing [description] => steel detailing [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 13:36:57 [listlimit] => 10 [structure] => {"94":{"137":{"contid":"137","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Sun Metals Zinc Ferrite Storage Drying Shed [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 13:30:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => sun-metals-zinc-ferrite-storage-drying-shed/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Sun Metals Zinc Ferrite Storage Drying Shed [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/94/blogskale_004.png [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/94/blogskale__big_004.png [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 149 [project_client] => Dawsons Engineering [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

Sun Metals Corporation (SMC) is the operator of the Sun Metals Zinc Refinery which is located 15 Kilometres South of the Port of Townsville. 

The New Zinc Ferrite Storage/Drying Facility for Sun Metals, involved some of the latest technology in structural steel fabrication with the use of the ILB system and included construction and installation of an underground conveyor unit.

 

Interesting facts;

Project was split into 5 fabrication packages.

4 week time frame to detail all structural steel.

Main Building consisted of 210 tonne of structural steel.

 

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-detailing"} ) [35] => Array ( [menuid] => 100 [title] => Aurizon Workshop and Offce [pageid] => 100 [seotitle] => aurizon-workshop-and-offce [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 1970-01-01 10:00:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-02-25 16:13:15 [listlimit] => 10 [structure] => {"100":{"143":{"contid":"143","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Aurizon Workshop and Office [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-02-25 16:08:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => aurizon-workshop-and-office/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Aurizon Workshop and Office [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/100/blogskale_20160610_155438.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/100/blogskale__big_20160610_155438.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 190 [project_client] => AURIZON [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

AURIZON invested $40 million to relocate all existing industrial rail activities near Townsville’s CBD to Stuart by the mid 2016, freeing up prime real estate for urban revitalisation projects. 

Interesting facts;

All steel framing designed, engineering, detailed and manufactured in house.

Total Man Hours = 527

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

[project_types] => {"0":"steel-frame-construction","1":"3d-laser-scanning"} ) [36] => Array ( [menuid] => 107 [title] => Defence - Growler Amberly [pageid] => 107 [seotitle] => defence-land-121-townsville [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-04 15:49:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-04-09 17:23:41 [listlimit] => 10 [structure] => {"107":{"156":{"contid":"156","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Defence - Growler Amberly [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-04-09 15:49:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => defence-land-121-townsville/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Defence - Growler Amberly [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/107/blogskale_dm_group.png [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/107/blogskale__big_dm_group.png [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 193 [project_client] => Lend Lease [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

News and media releases

Queensland Defence facilities upgrades to benefit military, industry and community

Growler airborne electronic attack capability facilities project to provide fit for purpose facilities to support and sustain employment of the new EA-18G Growler capability, which will involve upgrades for RAAF Base Amberley and the Oakey Army Aviation Centre. Lend Lease has begun construction.

[project_types] => {"0":"steel-detailing"} ) [37] => Array ( [menuid] => 108 [title] => Defence - Land 121 Townsville [pageid] => 108 [seotitle] => defence-land-121-townsville-eyc5p3 [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-04 17:15:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-04-09 17:24:12 [listlimit] => 10 [structure] => {"108":{"157":{"contid":"157","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Defence - Land 121 Townsville [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-04-09 17:15:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => defence-land-121-townsville-eyc5p3/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Defence - Land 121 Townsville [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/108/blogskale_dm_group.png [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/108/blogskale__big_dm_group.png [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 199 [project_client] => Lend Lease [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

LAND 121 STAGE 2 - UNIT SUSTAINMENT FACILITIES

Lavarack Barracks Proposed Works

The proposed LAND 121 vehicle facilities to be delivered at Lavarack Barracks include the following elements:

Buildings / New Infrastructure

  1. Vehicle Shelter 1
  2. Vehicle Shelter 2
  3. Vehicle Shelter 3
  4. Administration Building
  5. Personal Training Shelter
  6. Q-Store
  7. Workshop
  8. Recovery Platoon Facility
  9. Shower and Locker Facility
  10. Vehicle Shelter 1
  11. Vehicle Shelter 2
  12. Vehicle Shelter 3
  13. Vehicle Shelter 4
  14. Gas Shelter
[project_types] => {"0":"steel-detailing"} ) [38] => Array ( [menuid] => 109 [title] => Defence - Air Traffic Control Amberly [pageid] => 109 [seotitle] => defence-air-traffic-control-amberly [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-04 17:19:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-04-09 17:22:07 [listlimit] => 10 [structure] => {"109":{"158":{"contid":"158","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Defence - Air Traffic Control Amberly [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-04-09 17:19:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => defence-air-traffic-control-amberly/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => Defence - Air Traffic Control Amberly [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/109/blogskale_dm_group.png [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/109/blogskale__big_dm_group.png [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 202 [project_client] => Lend Lease [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

News and media releases


Queensland Defence facilities upgrades to benefit military, industry and community


AIR5431 air traffic management and control system facilities and Australian Defence Force air traffic control complex infrastructure project to support OneSKY by constructing new or upgraded existing air traffic control towers, airfield systems complex buildings and sensor equipment to buildings at 13 Defence bases and five off-base Defence sites across Australia. Construction commenced.

[project_types] => {"0":"steel-detailing"} ) [39] => Array ( [menuid] => 110 [title] => The Ville Casino - Townsville [pageid] => 110 [seotitle] => the-ville-casino-townsville [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-07-07 10:05:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-08-20 16:37:57 [listlimit] => 10 [structure] => {"110":{"159":{"contid":"159","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => The Ville Casino - Townsville [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-07-07 10:05:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => the-ville-casino-townsville/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-07-07 10:21:56 [seotitlebar] => The Ville Casino - Townsville [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] => [blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/110/blogskale_dm_group_steel_detailing_ville_1.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/110/blogskale__big_dm_group_steel_detailing_ville_1.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 205 [project_client] => [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

The Ville Resort–Casino has appointed Hutchinson Builders to complete its major redevelopment.

Hutchinson Builders’ are constructing the project to meet the tight deadlines which will include, among other developments, three new restaurants, a poolside function space to fit up to 700 people, an infinity-edge pool with private cabanas and a swim-up bar, and an elevated deck connecting the pool to the Lobby level above. 

Interesting Facts:

Architecturally designed building with great features and lines.

Structural steel detailing split into 3 packages for fabrication management.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

 

[project_types] => {"0":"steel-detailing"} ) [40] => Array ( [menuid] => 112 [title] => Waltzing Matilda - Museum [pageid] => 112 [seotitle] => waltzing-matilda-museum [keywords] => [description] => [featuretext] => [tags] => [dmozdesc] => 0 [scripts] => [styles] => [start] => 2017-09-08 18:37:00 [end] => 0000-00-00 00:00:00 [updated] => 2017-08-09 19:12:47 [listlimit] => 10 [structure] => {"112":{"162":{"contid":"162","index":0,"col":"col1","parent":0,"parentIndex":0}}} [menuPageType] => Page [menuTitle] => Waltzing Matilda - Museum [root_id] => 19 [approved_published] => 1 [status_approved_page] => 1 [date_start] => 2017-08-09 18:37:00 [event_start] => 1970-01-01 10:00:00 [event_end] => 1970-01-01 10:00:00 [typevalue] => [layoutfilename] => freestyle.json [date_end] => 0000-00-00 00:00:00 [finalseolink] => waltzing-matilda-museum/ [comments] => 0 [template] => Listing Detail [edit_date] => 2017-08-09 18:37:23 [seotitlebar] => Waltzing Matilda - Museum [listingTable] => listing_projects_264f5mzq [rootTitle] => Projects [parentTemplate] => Default [blogTitle] => Projects [blogLimit] => 1000 [blog_blogdetailstpl] => listing_details_default.php [blog_bloglistingtpl] => listing_listing_default.php [blog_featured] => 0 [blogUrl] => projects/ [pageCount] => 41 [isEventPost] => No [ContValuex] =>

A.Gabrielli Constructions (AGC), is currently in motion to deliver this amazing project.

The Waltzing Matilda Centre is an iconic Australian attraction. The redevelopment of the Centre is important for the community of Winton and is a must visit destination.

The new Centre due to be complete in early 2018 will contain a world class museum experience and will attract visitors from across Australia and the World.

Interesting Facts:

Cox Architecture designed the building with incredible roof lines and scope.

Structural steel detailing split into 3 packages for fabrication management.

3D Laser scanning and Robotic Total Station for quality assurance on set out.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

 

[blogimage] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/112/blogskale_dm_group_steel_shop_drawings_01.jpg [blogimage_big] => //s3-ap-southeast-2.amazonaws.com/os-data-2/dmgroup-com-au/images/pageattached/112/blogskale__big_dm_group_steel_shop_drawings_01.jpg [shareimage] => [prepend_title] => [append_title] => | DM Group [username] => dmgroup [firstname] => [lastname] => [member_since] => 2016-07-01 11:31:53 [show_author] => [show_avatar] => [show_date] => [lat] => [lng] => [address] => [fulldata] => [maptype] => [id] => 210 [project_client] => Winton Shire Council [project_year] => [project_type] => [project_gallery] => 0 [project_description] =>

A.Gabrielli Constructions (AGC), is currently in motion to deliver this amazing project.

The Waltzing Matilda Centre is an iconic Australian attraction. The redevelopment of the Centre is important for the community of Winton and is a must visit destination.

The new Centre due to be complete in early 2018 will contain a world class museum experience and will attract visitors from across Australia and the World.

Interesting Facts:

Cox Architecture designed the building with incredible roof lines and scope.

Structural steel detailing split into 3 packages for fabrication management.

3D Laser scanning and Robotic Total Station for quality assurance on as built and set out.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

 

[project_types] => {"0":"steel-detailing"} ) )

(07) 4772 6070
4 Somer Street, Hyde Park 4812
PO Box 3221 Hermit Park, QLD 4812

Email Us linkedinLinkedIn
ASI AISD